10/09/2026
Happy 🔧
Emptying a coal silo shouldn’t require a labor-intensive manual process every year.
Our fabrication team designed this custom chute to capture coal redirected by an ASGCO® Lift Bed–Diverter Plow™ at a power plant. The completed system will allow the facility to empty its silo using the existing conveyor—creating a more efficient, controlled material-handling process.
It’s a great example of how custom fabrication and conveyor engineering can work together to solve a site-specific operational challenge.
See how the Lift Bed–Diverter Plow™ creates additional discharge points along a conveyor system: bit.ly/4hlHRuh