05/03/2026
Transporting large process equipment is just as essential as the engineering of the equipment itself.
This SO₂ storage tank with integrated access platform was manufactured from SAF 2205 duplex stainless steel for a paper and pulp application and transported as a single assembled unit to reduce site work and installation time.
That choice required careful planning. Lifting points, restraints and temporary supports were designed to protect the pressure boundary, maintain alignment and manage transport loads without distortion.
Around three months of engineering and fabrication went into ensuring the equipment arrived on site ready to install and ready to perform.
A shout out to our ND Engineering team and their expertise in ensuring this equipment arrived at our clients safely.