11/03/2025
Trying to recover from a lightning strike.
The first 5 16 channel dimmer boxes have been dissembled, sent to the repair shop, returned and are now in reassembly.
There is a need for 2 new 120 V supply lines. The conduit is installed under the house, and currently waiting on parts for a distribution box.
The Fm transmitter is now working. FM 104.3 is the target frequency.
The wireless communication to get show across the road has been built, and will be tested as soon as the 120v lines are in.
1st prop frame under construction, at least 3 more needed.
Current status:
1 Channel
2 lights
0 min of animated lights/music